Clevo Door installation video
Instructions for our ceiling and wall modules:
1. take the drilling template that we send with the Clevo ceiling modules, sight it in the water and mark the drill holes.
![](https://cdn.shopify.com/s/files/1/0673/3112/9558/files/Schablone_20er_600x600.png?v=1673974756)
2. make sure that no power or gas lines pass behind the markings.
Green: OK
Red: Power or gas line in the way!
3. use the Fischer Duopower 10x80 screws supplied by us. Make sure that you always achieve > 2.5 kN with the wall/ceiling material and our 8x dowels (fixed).